Picture
Venezuela (2012-2013) – Geogreen and Beicip-Franlab has launched the next phase of the PDVSA CO2-EOR project aiming at realizing a pilot: Detailed CO2-EOR assessment including 3D modeling and simulation, well analysis, conceptual design for transport, risk analysis and MMV.

 
 
ULCOS

France (2012) – For the ULCOS Project, Geogreen performed a new stage in the storage project development: Administrative engineering for Seismic works declaration and danger study.


 
 
E.On
France (2012) – Following a first study carried out in in 2011, Geogreen has performed a second CCS-Ready assessment for a new power project of E.On, in France. As part of the assessment, Geogreen screened deep saline formations for storage suitability and completed the basic design, routing, and economic analysis for a potential CO2 transport system and the CO2 storage component. 

 
 
Picture

France (2012-2013) – Geogreen is the co-ordinator of the second phase of the MANAUS project (methodology for risk assessment) where the methodology developed in the first phases is applied to several test sites.


PROJECT PARTNERS

 
 
EU FP7
Europe/France (2011-2015) - The ULTIMATE CO2 Project, funded by the European FP7, is aimed at the investigation of the long-term fate of CO2 within a geological storage and will examine the physical behavior of the geology with experimentation at the core- and well-scale. Geogreen's participation entails the evaluation of the long-term fate of CO2 in the context of the ULCOS exploration permit in northeastern France. 

 
 
VASCO
France (2011-2012) - Geogreen is the project coordinator for this effort to develop a carbon management plan supported by a consortium of companies and public entities active in the industrial sectors around the Port of Marseille. Geogreen will perform an emissions source clustering and centralized emissions treatment (pooling) scenario development, the optimization of the emissions/CO2 collection systems and transport network, design and carbon and energy footprint analysis of the overall CO2 capture, transport and the eventual export scenarios to North Africa for EOR, CO2 valorization options around Marseille - including CO2 bio-remediation via micro-algae cultivation. 

PROJECT PARTNERS

 
 
Picture

France (2011) – In the framework of training proposed for IFP Training Geogreen has performed several training sessions in 2011 on CCS and its context, for different international groups and industries.


 
 
IFPEN

France (2011) – For IFPEN Geogreen carried out an assessment of integrated water management in CCS: from power production and capture to storage and reservoir pressure management.


 
 
Picture

France (2011) – Geogreen made a permeability-porosity analysis from wells logs and drilling reports for a deep saline aquifer in France, for BRGM.

 
 
Picture
United States (2011) - Geogreen was contracted by Sandia Technologies, LLC, an American energy and carbon services company, to perform onshore reservoir modeling and injection simulations for a potential brine re-injection in Louisiana. Specifically, Geogreen completed a saline aquifer assessment, built a geological model of the target formation, and performed several 3D injection simulations to optimize the injection pattern and assess the influence of key uncertainties.