Venezuela (2012-2013) – Geogreen and Beicip-Franlab has launched the next phase of the PDVSA CO2-EOR project aiming at realizing a pilot: Detailed CO2-EOR assessment including 3D modeling and simulation, well analysis, conceptual design for transport, risk analysis and MMV.

 
 
PDVSA Gas
Venezuela (2010 - 2013) - PDVSA has contracted Geogreen and Beicip Franlab (IFPEn subsidiary) to perform the subsurface engineering and transport design for a CO2-EOR feasibility study. Geogreen is involved in the following activities: a detailed CO2-EOR assessment including screening of onshore Oil Fields for EOR candidates, CO2 injection/CO2-EOR process simulations, well integrity analysis, conceptual design for the CO2 transport, transverse risk analysis, design of the monitoring (MMV) scheme.