
![]() France (2010-2012) - Geogreen has worked closely with the ULCOS project and ArcelorMittal on the development of CO2 transport and storage options for their industrial CCS demonstration on a steel plant at Florange, France. Geogreen is the owner's engineers for ArcelorMittal: providing storage options screening and evaluation, project management/ contracting, 3D geological modeling, petrophysical interpretation, hydrodynamic simulations of CO2 injections, construction/engineering of the storage complex model, seismic program design and management, transverse project risk analysis, injection well design, administrative engineering, and the basic design of the CO2 transport for the demonstration project submitted to the EU-NER-300.
![]() France (2008-2010) - Geogreen served as the owner's engineers for the CO2 transport and storage portions of the project while the possibility of a CCS pilot was being investigated by Veolia. In that context Geogreen performed an onshore storage suitability screening, 3D geological modeling, hydrodynamic CO2 injection simulations, delineation of the storage complex, risk analysis, the design of the MMV (measurement, monitoring, and verification) and safety programs, design of the well architecture (including the acoustic/well logs), drilling program definition, supervision of seismic processing, seismic interpretation, carbon and energy footprint analyses for the CO2 transport-storage chain, administrative engineering, and design of the water production tests. |
PROJECTSPROJECT TOPICS
All
|
